Cape Cod Commission - New England Wind 1 Connector (Virtual)

Event Date: 
Monday, March 27, 2023 - 5:00pm
Subcom m ittee Meeting Agenda
Cape Cod Com m ission- New  England W ind 1 Connector
DATE:  Monday, March 27, 2023
TIME:  5:00 p.m .
PLACE:  Virtual Meeting – access as detailed below
PHONE:   (929) 205-6099 and entering m eeting ID 967 5030 5211
Note: The hearing will be held virtually, pursuant to Chapter 20 of the Acts of 2021, as amended.
Members of the public can join the meeting using one of the following methods:
• By clicking on the following link:  https://capecodcommission.org/reg/join passcode: join
• Going online to www.capecodcommission.org/ccc and clicking on “Join Virtual Meeting.”
• Calling in using the number above. Phone participants wishing to speak should press * 9 to notify the
chair.
Meeting materials may be accessed at www.capecodcommission.org/ccc. It is recommended that phone participants access materials in advance of the meeting. Please join the virtual meeting at least fifteen minutes before the start of the meeting and email support@capecodcommission.org if you have any issues joining.
1. Attendance/ Roll Call
2. New England Wind 1 Connector:  the subcommittee will discuss the following Project and may vote
to make a recommendation to the full Commission on its decision.
Project:  New England Wind 1 Connector (f/k/a Vineyard Wind II) (CCC File No: 22005)
Project Applicants: Park City Wind, LLC
Project Location: Town of Barnstable
Project Description: Construction and operation of the portion of the New England Wind 1 connector located within Barnstable County, which Project is intended to connect to and serve the
proposed approximately 800-megawatt New England Wind 1 offshore wind project. The Project
includes, without limitation, offshore export cables located within Barnstable County waters; the cable landfall site at Craigville Beach; the onshore duct bank and associated onshore export cables located within and under existing rights of way through the village of Centerville; the proposed onshore substation located at 8 Shootflying Hill Road; and interconnection to the electric grid at the existing West Barnstable Substation on Oak Street.
Anyone wishing to testify orally will be welcome to do so.  Written comments may also be submitted by email prior to the hearing to regulatory@capecodcommission.org.
3. Adjourn